Are you here: Home > News > Company News

Installation Considerations for pre-heated air.
Author: Date:2013-1-26 16:33:09

The rain snow indoor dry place, avoid moisture;
 
Ventilated, avoid use in a sealed box;
 
Keep away from flammable, explosive and other dangerous items and gas;
 
The outlet shall install up-dip 15 °, down-dip within 10 °, inclination about the body in the range of 15 °;
 
The inlets are not blocked, and the outlet pipe connection of the bag with the insulation material, note that the pipe should not be too long and too small cornering and bending should not be excessive.


PREVIOUS:Industrial hot air blower humane setting characteristics
Next PAGE:Special precautions for hot air blower operation
  • 服务热线:
  • 0510-88159665
  • 博斯远科技: